Technical Notes 2024, Issue 20 - EDC 3-year Carriageway and Footway Resurfacing Programme
Section
- This technical note is intended to provide an update to Elected Members on the notional Roads Carriageway & Footway Resurfacing Programme for 2024/25, 2025/2026 and 2026/2027.
- he list will be finalised, and an Annual Programme confirmed for 2024/25 in April 2024 once the capital budget for the year has been confirmed.
- The remaining locations will be monitored in the interim period, with an annual programme confirmed for 2025/2026 and 2026/2027 at the start of each respective financial year, once capital budgets have been confirmed for the year.
- It is necessary that whatever funds are available are spent on the correct schemes at the right time and that schemes are prioritised using optimisation methodologies to maximise risk reduction and minimise whole life costs.
- The methods that East Dunbartonshire Council use to optimise our programme have been developed from best practice methods found in “Well-Managed Highway Infrastructure –A Code of Practice”.
- The carriageway and footway element of the capital programme is based on a scheme of prioritisation which uses condition assessment scores; prioritisation criteria; and weightings to determine which projects should be prioritised for investment.
- The condition of East Dunbartonshire Council roads is assessed annually as part of the Scottish Roads Maintenance Condition Survey (SRMCS), an independent survey of road conditions in all 32 Scottish local authorities. The survey provides each local authority with a Road Condition Index (RCI) which identifies the percentage of roads in need of maintenance.
- The current RCI score is 31.8% which is an improvement on the previous survey score of 34% (2019) which demonstrates that the overall condition of the carriageways has improved since the previous survey. The Scottish average RCI is 33.6%
- A visual inspection by road officers is source of accuracy on the condition of the network, in greater detail.
- In addition, and for the first time, the Service utilised Gaist Surveys (Unrivalled roadscape intelligence - Gaist). This full network survey allows the Roads Network Operations team a snapshot of reliable carriageway condition data, that will empower the team and officers to make the best investment decisions based on accurate data.
- The Team also investigates carriageway and footway maintenance issues to target improvements. The team analyse condition data available for each asset to identify need for maintenance and/or improvement.
- Network Hierarchy – the team ensure that greater priority is given to roads and key assets on roads that have the greatest usage or need.
- Risk – the team will give a higher priority to schemes that pose a risk to public safety.
- Value for Money – the team will use the right treatments at the right time in order to produce cost effective solutions.
- Network Management – the team endeavour to ensure works are programmed to minimise disruption to users and maximise benefits to the community, by combining schemes for different assets together where possible. For example, programme traffic sensitive roads during school holidays, if possible, etc.
- Each asset has is own set of prioritisation criteria and weighting sets based on the principles above, which consider the unique attributes and requirements of each asset.
- It is the aim of the Roads Network Operations teams to deliver all of the schemes listed in this report over a three-year period. However, this may not be possible due to unforeseen or emergency works causing potential conflict on the network. This is why there needs to be an element of flexibility in the programme to allow officers to react to any changes that may arise.
- If a location is not delivered due to a conflict it will remain on the overall programme and will be re-prioritised for delivery in a future financial year, or will be on hold until deploy of a suitable contractor i.e., locations contaminate with coal tar
- The capital work programme will be reviewed regularly to ensure that any adjustment is made to the programme as soon as possible, with these reflecting in the annual/quarterly updates issued to Elected Members in April, July, October, and January each year.
- The aspirational programme of 2024/25 is laid out for your information, but this may alter once the capital budget for 2024/25 is confirmed. The programme is based on the capital allocation for the current year which was used as a guide to allow for preparations to be made prior to any budget decisions being taken by Council.
- Footway and Carriageways are a maturing asset and in constant use, so the condition will change over time and it is important that there is recognition that the resurfacing programmes are provisionally only at this time. These will be subject to change depending on the outcome of the annual or ad-hoc/reactive condition assessment review process; result of coal tar; conflict with utility works; weather permit; and any other unforeseen circumstances.
- The investment in the East Dunbartonshire Council carriageways and footways improves the accessibility and safety of the road and footway network and therefore has a positive impact for all users, particularly older people, and those with a disability.
- 2024/25 Carriageway Programme (with notional programmed dates)
Location | Town | Start Date | Comments |
---|---|---|---|
Baljaffray Road (phase 3) | Bearsden | 01/04/2024 | Moorfoot to Golf Club |
Stockiemuir Road | Bearsden | 08/04/2024 | Ski club to Drymen Rd |
Waterside Road (Phase 2-overlay) | Kirkintilloch | 15/04/2024 | Drumgrew RB to Cottage |
Dumgoyne Ave (Phase 2) | Milngavie | 22/04/2024 | Balvie to Craigton Rd |
Kessington Road (phase 2) | Bearsden | 29/04/2024 | Killermonth to Albert Rd |
Afton Crescent | Bearsden | 06/05/2024 | Full -Lighting |
Kirkintilloch Road , Lenzie phase 1 | Lenzie | 13/05/2024 | from Gallowhill to Laurel |
Oxford Street and Kerr Street | Kirkintilloch | 20/05/2024 | Full Length |
Fintry Cres and Tinto | Bishopbriggs | 27/05/2024 | full length |
Russel Drive (phase 1) | Bearsden | 03/06/2024 | Full length |
Russel Drive (phase 2) | Bearsden | 10/06/2024 | Full length |
Kilsyth Road (phase 1) | Kirkintilloch | 17/06/2024 | Cala Homes to roundabout |
Milngavie Road (Phase 3) | Bearsden | 24/06/2024 | BP Garage to Manse Rd |
Main St (phase 1) | Twechar | 01/07/2024 | from canal bridge to School |
Main St (phase 2) | Twechar | 08/07/2024 | from canal bridge to School |
Boghead Road (phase 2) | Kirkintilloch | 15/07/2024 | Pinewood to Glenwood |
Westercledden Road | Bishopbriggs | 22/07/2024 | Hillside Drive to Laggan Road |
Ellagowan Road - Lighting | Milngavie | 29/07/2024 | Woodburn way to roundabout |
Mugdock Road /Ellagown Road-RB included | Milngavie | 05/08/2024 | Roundabout to Sinclair |
Boclair Road (phase1) | Bearsden | 12/08/2024 | Ardoch Road to Boclair Cre |
Boclair Road (phase2) | Bearsden | 19/08/2024 | Boclair Cre to Milngavie road |
Keystone Quadrant | Milngavie | 26/08/2024 | Full length |
Drumlin Drive | Milngavie | 02/09/2024 | Nether Meanis to Keystone |
Springfield Square | Bishopbriggs | 09/09/2024 | Full length |
Crowhill Road (phase 1) | Bishopbriggs | 16/09/2024 | Need order- One way - Auchnan to Hunter |
Crowhill Road (phase 2) | Bishopbriggs | 23/09/2024 | Hunter to Lee Cres |
Redmoss Road | Milton Of Campsie | 30/09/2024 | TBC |
Bailie Drive | Bearsden | 07/10/2024 | No 33 to 76 |
Angus Avenue | Bishopbriggs | 14/10/2024 | Letham to Westercledden Rd |
Campsie Drive | Milngavie | 21/10/2024 | Full length |
Methen Ave + Kenmore Gds + Ardoch Rd | Bearsden | 28/10/2024 | Full length |
Applecross Road | Kirkintilloch | 04/11/2024 | Full length |
Braehead St | Kirkintilloch | 11/11/2024 | Full length |
McGrigor Road | Milngavie | 18/11/2024 | Full length |
Forth Road | Torrance | 25/11/2024 | Full length |
Craigmarloch Ave | Torrance | 02/12/2024 | Full length |
Elspeth Gardens | Bishopbriggs | 09/12/2024 | Full length |
Tambowie Crescent | Milngavie | 16/12/2024 | Full length |
Campsie Drive | Bearsden | 23/12/2024 | No 33 to Baillie Drive |
Douglas Gar, Place, Court and Ave | Lenzie | 30/12/2024 | full length |
Second Avenue | Bearsden | 06/01/2025 | full length |
Heather Garden, Heather Place and Forest Gardens | Lenzie | 13/01/2025 | full length |
Heather Drive, Heather Place | Lenzie | 20/01/2025 | full length |
Old Balmore Road | Balmore | 27/01/2025 | TBC |
Southbank Road | Kirkintilloch | 03/02/2025 | full length |
Allander Road | Milngavie | 10/02/2025 | full length |
Campsie Road | Lennoxtown | 17/02/2025 | Kinkell To Barrhill |
Rannoch Drive (phase 1) | Bearsden | 24/02/2025 | Clunny to Spears (including 200sqm patch/structural repair front of no 58) |
Rannoch Drive (phase 2) | Bearsden | 03/03/2025 | Maryhill To Clunny |
Albert Drive | Bearsden | 10/03/2025 | Full Length |
- 2024/25 Footway Programme (with notional programmed dates)
Location - | Town | Start Date | Comments |
---|---|---|---|
Crarae Avenue | Bearsden | 01/04/2024 | Full Length |
Westfield Drive | Bearsden | 06/05/2024 | Full Length |
Maxwell Avenue | Bearsden | 13/05/2024 | Train Station to Number 121 both sides |
Main St | Milngavie | 27/05/2024 | Between Kelvin Timber and Waitrose-one sides |
Mugdock Road | Milngavie | 03/06/2024 | Town Centre to Roundabout including road connect to Hillhead-both sides |
Kirkintilloch Rd | Lenzie | 24/06/2024 | Between Myrtle Ave and Heath Ave |
Station Rd | Milngavie | 22/07/2024 | A81 to Kwikfit – both sides |
Prestonfield | Milngavie | 12/08/2024 | around school - Soth main St to school |
Drymen Road | Bearsden | 02/09/2024 | Gartconnell Dr to Stockiemuir Rd-Both sides |
Grampian Way | Bearsden | 30/09/2024 | Retail Park to Ledi Drive- Light |
Grampian Way | Bearsden | 14/10/2024 | School To Retail Park-Light |
Craigenbay | Lenzie | 28/10/2024 | Full Length |
Laxton Drive | Lenzie | 18/11/2024 | Full Length-Light |
Bramley Pl | Lenzie | 09/12/2024 | Full Length-Light |
Glenwood Road | Lenzie | 06/01/2025 | Full Length |
Westercleddens Road (phase 1) | Bishopbriggs | 03/02/2025 | Hillside Drive to St Helen's Primary School- both sides - Excluding section has already done-Lighting? |
Westercleddens Road (phase 2) | Bishopbriggs | 03/03/2025 | Hillside Drive to ST Helen's Primary School- both sides - Excluding section has already completed |
- 2025/26 Carriageway Programme (with no programmed dates)
Location | Town | Comments |
---|---|---|
Milngavie Road (phase 3) | Bearsden | McFarland Rd To Kessington |
McFarlane Rd (Cul de sac) /Milngavie Rd | Bearsden | MacFarlane Road (Speirs to End Cul de sac) and rest of Milngavie road |
Kirkintilloch Road (Phase 1) | Bishopbriggs | South Crosshill To Bishop Cross |
Kirkintilloch Road (Phase 2) | Bishopbriggs | Bishop Cross to Viewfield Road |
Kilsyth Road (phase 2) | Kirkintilloch | McDonald to RB |
Baljaffray Road (phase 4)+Duntocher RB | Bearsden | 275 m to Duntocher RB |
Stockiemuir Road (phase 4) | Milngavie | Hilton Golf club |
Duntocher Road (phase 1) | Bearsden | Between Former Garscaddon Depot and WDC boundary - 2 weeks work - order |
Duntocher Road (phase 2) | Bearsden | Between Former Garscaddon Depot and WDC boundary - 2 weeks work - order |
Milton Road | Lennoxtown | Benvue to Main Street |
Strathblane Road (Phase 1) | Milngavie | TBC |
Redbrae Road | Kirkintilloch | Dun Park to Waterside Roundabout |
Wester Cleddens Road | Bishopbriggs | Angus Ave to Wester Cledden RB |
Newdyke Road | Kirkintilloch | Eidon Rd to Hillhead Rd |
Letham Drive | Bishopbriggs | full |
Ledi Drive (phase 1) | Bearsden | Grampian Way to Sidlaw |
Ledi Drive (phase 2) | Bearsden | Sidlaw to Duntocher Rd |
Meadowburn (phase 2) | Bishopbriggs | Kirkintilloch Road to Cadder Gate |
Meadowburn (phase 1) | Bishopbriggs | Kirkintilloch Road to Cadder Gate |
Lenzie Road | Kirkintilloch | Gallowhill Rd to Eastergreens Ave |
Maxwell Ave | Bearsden | From number 119 to GCC boundary |
Regent SQ + Glenbank Rd | Lenzie | full |
Golf View + Park Cres | Bearsden | Full |
Boclair Road (phase3) | Bearsden | GCC Boundary to Millichen Road + Allander RB to EDC boundary sign |
Boclair Road (phase4) | Bearsden | Millichen Road to Artdoch Road |
Balmuildy Road | Bishopbriggs | Hilton Road to Hilton Terrace |
Burnbrae Road (phase 1) | Bishopbriggs | Blackland farm to Lindsaybeg Rd |
Carron Crescent + Birken Rd | Lenzie | full |
Maryhill Road | Bearsden | O/s BP, near junction with Rannoch, o/d Garscube Mill and Between Coronation and Milngavie Rd |
Dalkeith Avenue | Bishopbriggs | full |
Middleton Dive and Tower Place | Milngavie | full |
Lynn Drive and Balfleurs | Milngavie | full |
Moorfootway | Bearsden | Between Cromalt Cres and number 47 |
Parkburn Avenue | Kirkintilloch | full |
Kenmure Lane | Bishopbriggs | full |
Fintry Garden + Paterson Place | Bearsden | full |
Culloch Road | Bearsden | full |
Cloberfield | Milngavie | full |
Thorn Drive | Bearsden | Drymen to Iain |
Laxton Drive + Orchard Brae | Lenzie | Full |
Ralston Road | Bearsden | full |
Gartconnell Road | Bearsden | Cul de sac |
Auchinstarry Road | Twechar | full |
Southbank Drive | Kirkintilloch | full |
Carse View | Bearsden | full |
Crossveggate | Milngavie | full |
Main St | Milngavie | Mosshead to Burnbrae RB |
Main St | Milngavie | Mosshead to Burnbrae RB - Including RB |
Crosshill Road | Bishopbriggs | TBC |
- 2025/26 Footway Programme (with no programmed dates)
Location | Town | Comments |
---|---|---|
Inveroran Drive (phase 1) | Bearsden | Kessington to Glendaruel Ave-both side |
Switchback Road (near Toll) | Bearsden | Canniesburn Drive to Toll – One side- o/s old folks flats |
Drymen Road (near Toll) | Bearsden | Canniesburn Road to Toll (no 33-39) one side |
MacFarlane Road (near Toll) | Bearsden | mini RD to shops/ new surface – both side |
Drymen Road | Bearsden | Station Road To Cross- Around School |
Gallowhill Road (Phase 1) | Kirkintilloch | Beech to Moss both sides |
Boghead Road | Kirkintilloch | From Mosshead to BP garage – both sides |
Finlay Rise (phase 2) | Milngavie | Bridgegate to end of the road |
Milngavie Road (phase 2) | Bearsden | Mosshead to Manse - House side only |
Alexander Place | Kirkintilloch | Full Length |
Park St | Kirkintilloch | Full Length |
Birch Dr | Lenzie | Full Length |
Fellsview Ave | Kirkintilloch | Full Length |
Tambowie Ave | Milngavie | Full Length |
Auchinairn Road | Bishopbriggs | Between Scotmid Coop and War Memorial |
- 2026/27 Carriageway Programme (with no programmed dates)
Location | Town | Comments |
Stockiemuir Road (phase 5) | Bearsden | From Craighead drive toward Craigton -300m length -include RB-Order |
Campsie Road (Near traffic lights and Urban sections) | Lennoxtown | TBC |
Kilsyth Road (phase 3) | Kirkintilloch | Cala Homes to Council Depot |
Kilsyth Road (phase 3) | Kirkintilloch | Council Depot to 200 meters after B8023 |
Kirkintilloch Road (phase3) | Bishopbriggs | Between Crosshill RB and Westerhill |
Milton Road | Kirkintilloch | From Glasgow Rd to Bridge |
Craigmaddie Road | Balmore | Overlay - TBC |
Chryston Road | Kirkintilloch | Rail bridge to Ruther Ave - overlay |
Lenzie Road | Kirkintilloch | Gallowhill Rd to Eastergreens Ave |
Strathblane Road (Phase 2) | Milngavie | TBC |
Milngavie Road (phase 4) | Bearsden | Manse Road to Mosshead |
Milngavie Road (phase 5) | Bearsden | Manse Road to Mosshead |
Bellfield Road + Washington Road | Kirkintilloch | school to Glasgow Road |
Lindsaybeg Road (phase 1) | Bishopbriggs | Auchinloch to Easter Garngaber Rd |
Lindsaybeg Road (phase 2) | Bishopbriggs | Easter Garngaber to roundabout |
Main Street (phase 1) | Lennoxtown | Full |
Main Street (phase 2) | Lennoxtown | Full |
Newdyke Road | Kirkintilloch | Woodstock to Langmuir |
Meadowburn (phase 3) | Bishopbriggs | Hilton Rd to Calder |
Watermill Drive (phase 1) | Bishopbriggs | full |
Watermill Dr (phase 2)+Farm Park + Millas Plc | Bishopbriggs | full |
Woodilee Rd | Kirkintilloch | Full- |
Initiative road | Kirkintilloch | all the legs to and from Lindsaybeg Roundabout |
Badenoch Road | Kirkintilloch | full |
Burnbrae Road (phase 2) | Bishopbriggs | Lindsaybeg Rd to Muckcroft Rd-overlay |
Burnbrae Road (phase 3) | Bishopbriggs | Lindsaybeg Rd to Muckcroft Rd-overlay |
Orchard Field | Lenzie | full |
Waverley Crescent | Kirkintilloch | full |
Tower Road/Back O' Hill Road | Balmore | TBC |
New Lairdsland Road | Kirkintilloch | From Canal to Catherine St |
Juniper Drive | Kirkintilloch | full |
Glenwood Road | Lenzie | full |
Craigmore Road + Pentland Place | Bearsden | full |
Marmion Drive | Kirkintilloch | full |
Hilton Road | Milngavie | full |
Burnside Avenue | Kirkintilloch | full |
John Street | Kirkintilloch | full |
St Columba Drive | Kirkintilloch | full |
Millburn Street | Lennoxtown | full |
Moncrieff Avenue | Lenzie | full |
Glenbank Road + Regent Sq | Lenzie | full |
Willow Avenue + Cedar | Lenzie | full |
Kirk St | Milngavie | full |
Badenoch Road, Loran Place, Badenoch Road | Kirkintilloch | full |
Park Avenue | Bishopbriggs | full |
Benvue Road | Lennoxtown | full |
Finlay Rise (phase 1) | Milngavie | full |
Finlay Rise (phase 2) | Milngavie | full |
- 2026/27 Footway Programme (with no programmed dates)
Location | Town | Comments |
---|---|---|
Milngavie Road (phase 3) | Bearsden | Kessington to Moore Drive – both sides |
Kirkintilloch Road | Bishopbriggs | Meadow Burn to opp Westerhill Road-one sides |
Inveroran Drive (phase 2) | Bearsden | Glendaruel Ave to Durness Ave - around school - both sides |
Rosslyn Road | Bearsden | From Castlehill School To Drybursh Rd -both sides |
Elm Ave | Lenzie | Beech Road to Number 6 |
Roman Road | Bearsden | From School to Grange Road/Rail Bridge |
South Main Road | Milngavie | Full Length - both sides |
|
|
|
Gallowhill Road (Phase 2) | Kirkintilloch | Kirkintilloch Road to Beech - both sides |
Park Crescent | Torrance | Full Length |
Thorn Road | Bearsden | Thorn Drive to Golf club |
Main St | Balmore | Kelvin Bridge RB to Campsie Rd |