• Report by:

    Ann Davie, Chief Executive

  • TN Number:

    020-24

  • Subject:

     EDC 3-year Carriageway and Footway Resurfacing Programme  

  • Responsible Officer:

    Thomas McMenamin, Executive Officer - Roads & Neighbourhood Services

  • Publication:

    Publication: This Technical Note will be published on the Council’s website following circulation to Members. Its contents may be disclosed or shared out with the Council

Section

  1. This technical note is intended to provide an update to Elected Members on the notional Roads Carriageway & Footway Resurfacing Programme for 2024/25, 2025/2026 and 2026/2027. 
  2. he list will be finalised, and an Annual Programme confirmed for 2024/25 in April 2024 once the capital budget for the year has been confirmed. 
  3. The remaining locations will be monitored in the interim period, with an annual programme confirmed for 2025/2026 and 2026/2027 at the start of each respective financial year, once capital budgets have been confirmed for the year. 
  4. It is necessary that whatever funds are available are spent on the correct schemes at the right time and that schemes are prioritised using optimisation methodologies to maximise risk reduction and minimise whole life costs. 
  5. The methods that East Dunbartonshire Council use to optimise our programme have been developed from best practice methods found in “Well-Managed Highway Infrastructure –A Code of Practice”.
  6. The carriageway and footway element of the capital programme is based on a scheme of prioritisation which uses condition assessment scores; prioritisation criteria; and weightings to determine which projects should be prioritised for investment.
  7. The condition of East Dunbartonshire Council roads is assessed annually as part of the Scottish Roads Maintenance Condition Survey (SRMCS), an independent survey of road conditions in all 32 Scottish local authorities. The survey provides each local authority with a Road Condition Index (RCI) which identifies the percentage of roads in need of maintenance.
  8. The current RCI score is 31.8% which is an improvement on the previous survey score of 34% (2019) which demonstrates that the overall condition of the carriageways has improved since the previous survey. The Scottish average RCI is 33.6%
  9. A visual inspection by road officers is source of accuracy on the condition of the network, in greater detail.
  10. In addition, and for the first time, the Service utilised Gaist Surveys (Unrivalled roadscape intelligence - Gaist). This full network survey allows the Roads Network Operations team a snapshot of reliable carriageway condition data, that will empower the team and officers to make the best investment decisions based on accurate data. 
  11. The Team also investigates carriageway and footway maintenance issues to target improvements. The team analyse condition data available for each asset to identify need for maintenance and/or improvement. 
  • Network Hierarchy – the team ensure that greater priority is given to roads and key assets on roads that have the greatest usage or need. 
  • Risk – the team will give a higher priority to schemes that pose a risk to public safety. 
  • Value for Money – the team will use the right treatments at the right time in order to produce cost effective solutions. 
  1. Network Management – the team endeavour to ensure works are programmed to minimise disruption to users and maximise benefits to the community, by combining schemes for different assets together where possible. For example, programme traffic sensitive roads during school holidays, if possible, etc.
  2. Each asset has is own set of prioritisation criteria and weighting sets based on the principles above, which consider the unique attributes and requirements of each asset. 
  3. It is the aim of the Roads Network Operations teams to deliver all of the schemes listed in this report over a three-year period. However, this may not be possible due to unforeseen or emergency works causing potential conflict on the network. This is why there needs to be an element of flexibility in the programme to allow officers to react to any changes that may arise. 
  4. If a location is not delivered due to a conflict it will remain on the overall programme and will be re-prioritised for delivery in a future financial year, or will be on hold until deploy of a suitable contractor i.e., locations contaminate with coal tar 
  5. The capital work programme will be reviewed regularly to ensure that any adjustment is made to the programme as soon as possible, with these reflecting in the annual/quarterly updates issued to Elected Members in April, July, October, and January each year. 
  6. The aspirational programme of 2024/25 is laid out for your information, but this may alter once the capital budget for 2024/25 is confirmed. The programme is based on the capital allocation for the current year which was used as a guide to allow for preparations to be made prior to any budget decisions being taken by Council. 
  7. Footway and Carriageways are a maturing asset and in constant use, so the condition will change over time and it is important that there is recognition that the resurfacing programmes are provisionally only at this time. These will be subject to change depending on the outcome of the annual or ad-hoc/reactive condition assessment review process; result of coal tar; conflict with utility works; weather permit; and any other unforeseen circumstances. 
  8. The investment in the East Dunbartonshire Council carriageways and footways improves the accessibility and safety of the road and footway network and therefore has a positive impact for all users, particularly older people, and those with a disability.
  9. 2024/25 Carriageway Programme (with notional programmed dates)

Location

Town

Start Date

Comments

Baljaffray Road (phase 3)

Bearsden

01/04/2024

Moorfoot to Golf Club

Stockiemuir Road

Bearsden

08/04/2024

Ski club to Drymen Rd

Waterside Road (Phase 2-overlay)

Kirkintilloch

15/04/2024

Drumgrew RB to Cottage

Dumgoyne Ave (Phase 2)

Milngavie

22/04/2024

Balvie to Craigton Rd

Kessington Road (phase 2)

Bearsden

29/04/2024

Killermonth to Albert Rd

Afton Crescent

Bearsden

06/05/2024

Full -Lighting

Kirkintilloch Road , Lenzie phase 1

Lenzie

13/05/2024

from Gallowhill to Laurel

Oxford Street and Kerr Street

Kirkintilloch

20/05/2024

Full Length

Fintry Cres and Tinto

Bishopbriggs

27/05/2024

full length

Russel Drive (phase 1)

Bearsden

03/06/2024

Full length

Russel Drive (phase 2)

Bearsden

10/06/2024

Full length

Kilsyth Road (phase 1)

Kirkintilloch

17/06/2024

Cala Homes to roundabout

Milngavie Road (Phase 3)

Bearsden

24/06/2024

BP Garage to Manse Rd

Main St (phase 1)

Twechar

01/07/2024

from canal bridge to School

Main St (phase 2)

Twechar

08/07/2024

from canal bridge to School

Boghead Road (phase 2)

Kirkintilloch

15/07/2024

Pinewood to Glenwood

Westercledden Road

Bishopbriggs

22/07/2024

Hillside Drive to Laggan Road

Ellagowan Road - Lighting

Milngavie

29/07/2024

Woodburn way to roundabout

Mugdock Road /Ellagown Road-RB included

Milngavie

05/08/2024

Roundabout to Sinclair

Boclair Road (phase1)

Bearsden

12/08/2024

Ardoch Road to Boclair Cre

Boclair Road (phase2)

Bearsden

19/08/2024

Boclair Cre to Milngavie road

Keystone Quadrant

Milngavie

26/08/2024

Full length

Drumlin Drive

Milngavie

02/09/2024

Nether Meanis to Keystone

Springfield Square

Bishopbriggs

09/09/2024

Full length

Crowhill Road (phase 1)

Bishopbriggs

16/09/2024

Need order- One way - Auchnan to Hunter

Crowhill Road (phase 2)

Bishopbriggs

23/09/2024

Hunter to Lee Cres

Redmoss Road

Milton Of Campsie

30/09/2024

TBC

Bailie Drive

Bearsden

07/10/2024

No 33 to 76

Angus Avenue

Bishopbriggs

14/10/2024

Letham to Westercledden Rd

Campsie Drive

Milngavie

21/10/2024

Full length

Methen Ave + Kenmore Gds + Ardoch Rd

Bearsden

28/10/2024

Full length

Applecross Road

Kirkintilloch

04/11/2024

Full length

Braehead St

Kirkintilloch

11/11/2024

Full length

McGrigor Road

Milngavie

18/11/2024

Full length

Forth Road

Torrance

25/11/2024

Full length

Craigmarloch Ave

Torrance

02/12/2024

Full length

Elspeth Gardens

Bishopbriggs

09/12/2024

Full length

Tambowie Crescent

Milngavie

16/12/2024

Full length

Campsie Drive

Bearsden

23/12/2024

No 33 to Baillie Drive

Douglas Gar, Place, Court and Ave

Lenzie

30/12/2024

full length

Second Avenue

Bearsden

06/01/2025

full length

Heather Garden, Heather Place and Forest Gardens

Lenzie

13/01/2025

full length

Heather Drive, Heather Place

Lenzie

20/01/2025

full length

Old Balmore Road

Balmore

27/01/2025

TBC

Southbank Road

Kirkintilloch

03/02/2025

full length

Allander Road

Milngavie

10/02/2025

full length

Campsie Road

Lennoxtown

17/02/2025

Kinkell To Barrhill

Rannoch Drive (phase 1)

Bearsden

24/02/2025

Clunny to Spears (including 200sqm patch/structural repair front of no 58)

Rannoch Drive (phase 2)

Bearsden

03/03/2025

Maryhill To Clunny

Albert Drive

Bearsden

10/03/2025

Full Length

  1. 2024/25 Footway Programme (with notional programmed dates)

Location -

Town

Start Date

Comments

Crarae Avenue

Bearsden

01/04/2024

Full Length

Westfield Drive

Bearsden

06/05/2024

Full Length

Maxwell Avenue

Bearsden

13/05/2024

Train Station to Number 121 both sides

Main St

Milngavie

27/05/2024

Between Kelvin Timber and Waitrose-one sides

Mugdock Road

Milngavie

03/06/2024

Town Centre to Roundabout including road connect to Hillhead-both sides

Kirkintilloch Rd

Lenzie

24/06/2024

Between Myrtle Ave and Heath Ave

Station Rd

Milngavie

22/07/2024

A81 to Kwikfit – both sides

Prestonfield

Milngavie

12/08/2024

around school - Soth main St to  school

Drymen Road

Bearsden

02/09/2024

Gartconnell Dr to Stockiemuir Rd-Both sides

Grampian Way

Bearsden

30/09/2024

Retail Park to Ledi Drive- Light

Grampian Way

Bearsden

14/10/2024

School To Retail Park-Light

Craigenbay

Lenzie

28/10/2024

Full Length

Laxton Drive

Lenzie

18/11/2024

Full Length-Light

 Bramley Pl

Lenzie

09/12/2024

Full Length-Light

Glenwood Road

Lenzie

06/01/2025

Full Length

Westercleddens Road (phase 1)

Bishopbriggs

03/02/2025

Hillside Drive to St Helen's Primary School- both sides - Excluding section has already done-Lighting?

Westercleddens Road (phase 2)

Bishopbriggs

03/03/2025

Hillside Drive to ST Helen's Primary School- both sides - Excluding section has already completed

  1. 2025/26 Carriageway Programme (with no programmed dates)

Location

Town

Comments

Milngavie Road (phase 3)

Bearsden

McFarland Rd To Kessington

McFarlane Rd (Cul de sac) /Milngavie Rd

Bearsden

MacFarlane Road (Speirs to End Cul de sac) and rest of Milngavie road

Kirkintilloch Road (Phase 1)

Bishopbriggs

South Crosshill To Bishop Cross

Kirkintilloch Road (Phase 2)

Bishopbriggs

Bishop Cross to Viewfield Road

Kilsyth Road (phase 2)

Kirkintilloch

McDonald to RB

Baljaffray Road (phase 4)+Duntocher RB

Bearsden

275 m to Duntocher RB

Stockiemuir Road (phase 4)

Milngavie

Hilton Golf club

Duntocher Road (phase 1)

Bearsden

Between Former Garscaddon Depot and WDC boundary - 2 weeks work - order

Duntocher Road (phase 2)

Bearsden

Between Former Garscaddon Depot and WDC boundary - 2 weeks work - order

Milton Road

Lennoxtown

Benvue to Main Street

Strathblane Road (Phase 1)

Milngavie

TBC

Redbrae Road

Kirkintilloch

Dun Park to Waterside Roundabout

Wester Cleddens Road

Bishopbriggs

Angus Ave to Wester Cledden RB

Newdyke Road

Kirkintilloch

Eidon Rd to Hillhead Rd

Letham Drive

Bishopbriggs

full

Ledi Drive (phase 1)

Bearsden

Grampian Way to Sidlaw

Ledi Drive (phase 2)

Bearsden

Sidlaw to Duntocher Rd

Meadowburn (phase 2)

Bishopbriggs

Kirkintilloch Road to Cadder Gate

Meadowburn (phase 1)

Bishopbriggs

Kirkintilloch Road to Cadder Gate

Lenzie Road

Kirkintilloch

Gallowhill Rd to Eastergreens Ave

Maxwell Ave

Bearsden

From number 119 to GCC boundary

Regent SQ + Glenbank Rd

Lenzie

full

Golf View + Park Cres

Bearsden

Full

Boclair Road (phase3)

Bearsden

GCC Boundary to Millichen Road + Allander RB to EDC boundary sign

Boclair Road (phase4)

Bearsden

Millichen Road to Artdoch Road

Balmuildy Road

Bishopbriggs

Hilton Road to Hilton Terrace

Burnbrae Road (phase 1)

Bishopbriggs

Blackland farm to Lindsaybeg Rd

Carron Crescent + Birken Rd

Lenzie

full

Maryhill Road

Bearsden

O/s BP, near junction with Rannoch, o/d Garscube Mill and Between Coronation and Milngavie Rd

Dalkeith Avenue

Bishopbriggs

full

Middleton Dive and Tower Place

Milngavie

full

Lynn Drive and Balfleurs

Milngavie

full

Moorfootway

Bearsden

Between Cromalt Cres and number 47

Parkburn Avenue

Kirkintilloch

full

Kenmure Lane

Bishopbriggs

full

Fintry Garden + Paterson Place

Bearsden

full

Culloch Road

Bearsden

full

Cloberfield

Milngavie

full

Thorn Drive

Bearsden

Drymen to Iain

Laxton Drive + Orchard Brae

Lenzie

Full

Ralston Road

Bearsden

full

Gartconnell Road

Bearsden

Cul de sac

Auchinstarry Road

Twechar

full

Southbank Drive

Kirkintilloch

full

Carse View

Bearsden

full

Crossveggate

Milngavie

full

Main St

Milngavie

Mosshead to Burnbrae RB

Main St

Milngavie

Mosshead to Burnbrae RB - Including RB

Crosshill Road

Bishopbriggs

TBC

  1. 2025/26 Footway Programme (with no programmed dates)

Location

Town

Comments

Inveroran Drive (phase 1)

Bearsden

Kessington to Glendaruel Ave-both side

Switchback Road (near Toll)

Bearsden

Canniesburn Drive to Toll – One side- o/s old folks flats

Drymen Road (near Toll)

Bearsden

Canniesburn Road to Toll (no 33-39) one side

MacFarlane Road (near Toll)

Bearsden

mini RD to shops/ new surface – both side

Drymen Road

Bearsden

Station Road To Cross- Around School

Gallowhill Road (Phase 1)

Kirkintilloch

Beech to Moss both sides

Boghead Road

Kirkintilloch

From Mosshead to BP garage – both sides

Finlay Rise (phase 2)

Milngavie

Bridgegate to end of the road

Milngavie Road (phase 2)

Bearsden

Mosshead to Manse - House side only

Alexander Place

Kirkintilloch

Full Length

Park St

Kirkintilloch

Full Length

Birch Dr

Lenzie

Full Length

Fellsview Ave

Kirkintilloch

Full Length

Tambowie Ave

Milngavie

Full Length

Auchinairn Road

Bishopbriggs

Between Scotmid Coop and War Memorial


  1. 2026/27 Carriageway Programme (with no programmed dates)

Location

Town

Comments

Stockiemuir Road (phase 5)

Bearsden

From Craighead drive toward Craigton -300m length -include RB-Order

Campsie Road (Near traffic lights and Urban sections)

Lennoxtown

TBC

Kilsyth Road (phase 3)

Kirkintilloch

Cala Homes to Council Depot

Kilsyth Road (phase 3)

Kirkintilloch

Council Depot to 200 meters after B8023

Kirkintilloch Road (phase3)

Bishopbriggs

Between Crosshill RB and Westerhill

Milton Road

Kirkintilloch

From Glasgow Rd to Bridge

Craigmaddie Road

Balmore

Overlay - TBC

Chryston Road

Kirkintilloch

Rail bridge to Ruther Ave - overlay

Lenzie Road

Kirkintilloch

Gallowhill Rd to Eastergreens Ave

Strathblane Road (Phase 2)

Milngavie

TBC

Milngavie Road (phase 4)

Bearsden

Manse Road to Mosshead

Milngavie Road (phase 5)

Bearsden

Manse Road to Mosshead

Bellfield Road + Washington Road

Kirkintilloch

school to Glasgow Road

Lindsaybeg Road (phase 1)

Bishopbriggs

Auchinloch to Easter Garngaber Rd

Lindsaybeg Road (phase 2)

Bishopbriggs

Easter Garngaber to roundabout

Main Street (phase 1)

Lennoxtown

Full

Main Street (phase 2)

Lennoxtown

Full

Newdyke Road

Kirkintilloch

Woodstock to Langmuir

Meadowburn (phase 3)

Bishopbriggs

Hilton Rd to Calder

Watermill Drive (phase 1)

Bishopbriggs

full

Watermill Dr (phase 2)+Farm Park + Millas Plc

Bishopbriggs

full

Woodilee Rd

Kirkintilloch

Full-

Initiative road

Kirkintilloch

all the legs to and from Lindsaybeg Roundabout

Badenoch Road

Kirkintilloch

full

Burnbrae Road (phase 2)

Bishopbriggs

Lindsaybeg Rd to Muckcroft Rd-overlay

Burnbrae Road (phase 3)

Bishopbriggs

Lindsaybeg Rd to Muckcroft Rd-overlay

Orchard Field

Lenzie

full

Waverley Crescent

Kirkintilloch

full

Tower Road/Back O' Hill Road

Balmore

TBC

New Lairdsland Road

Kirkintilloch

From Canal to Catherine St

Juniper Drive

Kirkintilloch

full

Glenwood Road

Lenzie

full

Craigmore Road + Pentland Place

Bearsden

full

Marmion Drive

Kirkintilloch

full

Hilton Road

Milngavie

full

Burnside Avenue

Kirkintilloch

full

John Street

Kirkintilloch

full

St Columba Drive

Kirkintilloch

full

Millburn Street

Lennoxtown

full

Moncrieff Avenue

Lenzie

full

Glenbank Road + Regent Sq

Lenzie

full

Willow Avenue + Cedar

Lenzie

full

Kirk St

Milngavie

full

Badenoch Road, Loran Place, Badenoch Road

Kirkintilloch

full

Park Avenue

Bishopbriggs

full

Benvue Road

Lennoxtown

full

Finlay Rise (phase 1)

Milngavie

full

Finlay Rise (phase 2)

Milngavie

full

  1. 2026/27 Footway Programme (with no programmed dates)

Location

Town

Comments

Milngavie Road (phase 3)

Bearsden

Kessington to Moore Drive – both sides

Kirkintilloch Road

Bishopbriggs

Meadow Burn to opp Westerhill Road-one sides

Inveroran Drive (phase 2)

Bearsden

Glendaruel Ave to Durness Ave - around school - both sides

Rosslyn Road

Bearsden

From Castlehill School To Drybursh Rd -both sides

Elm Ave

Lenzie

Beech Road to Number 6

Roman Road

Bearsden

From School to Grange Road/Rail Bridge

South Main Road

Milngavie

Full Length - both sides

 

 

 

Gallowhill Road (Phase 2)

Kirkintilloch

Kirkintilloch Road to Beech - both sides

Park Crescent

Torrance

Full Length

Thorn Road

Bearsden

Thorn Drive to Golf club

Main St

Balmore

Kelvin Bridge RB to Campsie Rd