Important announcement

Temporary Disruption to Housing Services 

Due to a scheduled system upgrade, some housing services may be limited or unavailable between Friday 15 August and Tuesday 19 August 2025.

We apologise for any inconvenience and appreciate your patience during this time. 

The Kirkintilloch Business Gateway area between the A806 Initiative Road and Woodilee Road is identified in Local Development Plan 2 as key regeneration site.

It currently contains a mixture of existing businesses and vacant/derelict sites. A masterplan has been prepared to support existing businesses and encourage the development of vacant and derelict land. The masterplan includes information on:

  • The aims of the masterplan and how it was prepared
  • Plans showing how the Business Gateway area should be developed in the future, including land uses, potential building layouts, landscaping and open space, and vehicular, pedestrian and cycling access routes
  • An explanation of how the masterplan is expected to be delivered, including specific requirements for different parts of the site
  • A summary of technical and engineering issues.